Cal-ITP

Monthly GTFS Quality Report
El Dorado Transit  ·  Nov 2021

This is a monthly report, generated by the California Integrated Travel Project (Cal-ITP), summarizing issues discovered by MobilityData’s GTFS Validator. This report is available for viewing by the general public to support continuous improvement of GTFS data and the experience of transit passengers.


Feed Published
20221101
Feed End Date
0
Days With No Service
10
Routes
124
Stops

Aggregated metrics for  Nov

  • Service hours per day in the active feed:

Changes from Nov 01 to Nov 30

  • Percentage of stop and route IDs that have changed since the previous month.
  • More than 5% being new or dropped is a cause for attention.

Consistency with the California GTFS Minimum Guidelines

Do the following files/fields exist? 2021-11-07 2021-11-21
Visual display shapes.txt
Navigation levels.txt
pathways.txt
Fares fare_leg_rules.txt
fare_rules.txt
Technical contacts feed_info.txt
Validation errors observed Number of errors
Error Name Error Description 2021-11-07 2021-11-21
too_fast_travel As implemented in the original Google Python GTFS validator, the calculated speed between stops should not be greater than 150 km/h (42 m/s SI or 93 mph). 13 13