Cal-ITP

Monthly GTFS Quality Report
MVGO  ·  Dec 2021

This is a monthly report, generated by the California Integrated Travel Project (Cal-ITP), summarizing issues discovered by MobilityData’s GTFS Validator. This report is available for viewing by the general public to support continuous improvement of GTFS data and the experience of transit passengers.


Current GTFS Feed Info

02-28-2022
Feed End Date
9
Days With No Service
4
Routes
35
Stops

Aggregated metrics for  Dec

  • Service hours per day in the active feed:

Changes from Dec 01 to Dec 31

  • Percentage of stop and route IDs that have changed since the previous month.
  • More than 5% being new or dropped is a cause for attention.

Consistency with the California GTFS Minimum Guidelines

Do the following files/fields exist? 2021-12-05 2021-12-19
Visual display shapes.txt
Navigation levels.txt
pathways.txt
Fares fare_leg_rules.txt
fare_rules.txt
Technical contacts feed_info.txt
Cal-ITP validation errors observed Number of errors
Error Name Error Description 2021-12-05 2021-12-19
feed_expiration_date At any time, the published GTFS dataset should be valid for at least the next 7 days, and ideally for as long as the operator is confident that the schedule will continue to be operated. If possible, the GTFS dataset should cover at least the next 30 days of service. 1 1