Cal-ITP

Monthly GTFS Quality Report
Foothill Transit  ·  Feb 2022

This is a monthly report, generated by the California Integrated Travel Project (Cal-ITP), summarizing issues discovered by MobilityData’s GTFS Validator. This report is available for viewing by the general public to support continuous improvement of GTFS data and the experience of transit passengers.


Feed Published
20220528
Feed End Date
10
Days With No Service
38
Routes
1823
Stops

Aggregated metrics for  Feb

  • Service hours per day in the active feed:

Changes from Feb 01 to Feb 28

  • Percentage of stop and route IDs that have changed since the previous month.
  • More than 5% being new or dropped is a cause for attention.

Consistency with the California GTFS Minimum Guidelines

Do the following files/fields exist? 2022-02-20
Visual display shapes.txt
Navigation levels.txt
pathways.txt
Fares fare_leg_rules.txt
fare_rules.txt
Technical contacts feed_info.txt
Cal-ITP validation errors observed Number of errors
Error Name Error Description 2022-02-06 2022-02-20
decreasing_or_equal_shape_distance Two consecutive points in shapes.txt should have increasing values for shape_dist_traveled. If the values are equal, this is considered as an error. 3486
missing_required_file A required file is missing. 5
more_than_one_entity A file that is expected to have only one row has more than one row. 1
stop_time_with_arrival_before_previous_departure_time The departure_time must not precede the arrival_time in stop_times.txt if both are given. 14