Cal-ITP

Monthly GTFS Quality Report
Santa Ynez Valley Transit  ·  Feb 2022

This is a monthly report, generated by the California Integrated Travel Project (Cal-ITP), summarizing issues discovered by MobilityData’s GTFS Validator. This report is available for viewing by the general public to support continuous improvement of GTFS data and the experience of transit passengers.


Feed Published
20230228
Feed End Date
4
Days With No Service
2
Routes
34
Stops

Aggregated metrics for  Feb

  • Service hours per day in the active feed:

Changes from Feb 01 to Feb 28

  • Percentage of stop and route IDs that have changed since the previous month.
  • More than 5% being new or dropped is a cause for attention.

Consistency with the California GTFS Minimum Guidelines

Do the following files/fields exist? 2022-02-06 2022-02-20
Visual display shapes.txt
Navigation levels.txt
pathways.txt
Fares fare_leg_rules.txt
fare_rules.txt
Technical contacts feed_info.txt
Cal-ITP validation errors observed Number of errors
Error Name Error Description 2022-02-06 2022-02-20
decreasing_or_equal_shape_distance Two consecutive points in shapes.txt should have increasing values for shape_dist_traveled. If the values are equal, this is considered as an error. 51 51
feed_expiration_date At any time, the published GTFS dataset should be valid for at least the next 7 days, and ideally for as long as the operator is confident that the schedule will continue to be operated. If possible, the GTFS dataset should cover at least the next 30 days of service. 1 1