Cal-ITP

Monthly GTFS Quality Report
Vine Transit  ·  May 2022

This is a monthly report, generated by the California Integrated Travel Project (Cal-ITP), summarizing issues discovered by MobilityData’s GTFS Validator. This report is available for viewing by the general public to support continuous improvement of GTFS data and the experience of transit passengers.


Current GTFS Feed Info

11-01-2022
Feed End Date
1
Days With No Service
9
Routes
330
Stops

Aggregated metrics for  May

  • Service hours per day in the active feed:

Changes from May 01 to May 31

  • Percentage of stop and route IDs that have changed since the previous month.
  • More than 5% being new or dropped is a cause for attention.

Consistency with the California GTFS Minimum Guidelines

Do the following files/fields exist? 2022-05-01 2022-05-15 2022-05-29
Visual display shapes.txt
Navigation levels.txt
pathways.txt
Fares fare_leg_rules.txt
fare_rules.txt
Technical contacts feed_info.txt
Validation errors observed
Error Name Error Description Severity
route_short_name_too_long Short name of a route is too long (more than 12 characters). Note that major trip planning applications start truncating short names after seven characters. WARNING
Cal-ITP validation errors observed Number of errors
Error Name Error Description 2022-05-01 2022-05-15 2022-05-29
route_short_name_too_long Short name of a route is too long (more than 12 characters). Note that major trip planning applications start truncating short names after seven characters. 2